Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9269

Scheduled reports fail - Object Could Not be Scheduled

$
0
0

I have a newly installed BOXI 3 SP6 environment made up of two clustered servers. Each cluster has 1 adaptive jobs server and 1 deski job server.

 

I have a schedule of 10 reports (7 deski and 3 webi) scheduled to run at 9am each day. I have never managed to get these 10 reports to refresh at the same time successfully. A number of these reports fail with 'Object could not be scheduled' message. Today only 3 deski and 1 webi report ran successfully. The reports are hitting job servers on both my nodes and sometime node 1 will run the job and fail and sometimes it will be node 2. Also the reports which fail are not the same each day which leads me to believe this is an issue with the number of jobs been scheduled to run concurrently.

 

Maximum concurrent jobs on both the adaptive and deski job servers is set to 10.

 

Attached is one of the job server trace files.

 

Anyone got any ideas what the issue could be?


Viewing all articles
Browse latest Browse all 9269

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>