Jan,
I understand and I actually thought that was what you were doing BUT my confusion came about when I chose "Traditional implementation with full blueprint" and then was not able to find a sample project plan or a listing of WBS elements that did not have "missing" elements as mentioned in my previous post. (I would have thought that when you generated / pulled from the WBS master that it would have renumbered appropriately such that there are no gaps in the WBS Structure).
In your final paragraph above you say: "For needs of project schedule creation you can pick the pre-selection we created for your type of project and use that as a starting point. That is easiest way to get started."
So if I choose the pre-selection (traditional) what "output" should I be using to generate a project plan?? - (as there is no mpp accelerator template / sample project plan).
Thanks Jan!!
Bob