Hi Ram,
Thank you for the info.
In my case, i have created dummy default operation in OPJG. So i feel the control key need NOT have "Cost" check box in OP67. But my production order will be costed with material cost know, even though the control key is NOT having the "Cost" indicator. Am i right?
Thanks