Hello everyone,
We have a multiple ledger set-up, where we copy actual values to a plan version, run distributions and allocations, calculate plan prices for activities and finally run the AVR cockpit. In this way, COGS and stock values for non-project production are determined for this parallel ledger.
However, in addition to discrete manufacturing, we also have ETO projects. These projects collect material and activity costs and WIP is calculated and posted for them. I presume the AVR cockpit takes care of material costs, but how does one go about applying activity plan prices to projects and calculating and posting WIP for them in the parallel ledger?
Thanks.